久久亚洲精品AV成人无码_成人国产色情免费观看_国产高清无码在线com_成年女人免费视频播放体验区_国产成人综合亚洲精品_精品成人a片久久久久久不卡三区_免费无码婬片AAAA片直播表情_国产无遮挡裸体免费视频_久久免费看少妇高潮A片特爽_国产好爽…又高潮了毛片

Welcome to visit SHANDONG JINGLIANG HIGHWAY MACH.CO.,LTD.!
Shandong Jingliang Highway Machinery Co., Ltd.,
Your present location:Home>新聞資訊

Cycle stages of equipment rice milling process

2022
5/9
被閱讀:243次

The time required to produce a given quantity of rice includes the initial setup time and the cycle

The time required to produce a given quantity of rice includes the initial setup time and the cycle time for each rice. The setting time consists of the installation time of the rice milling equipment, the motion planning of the tool (whether manually or machine executed), and the installation of the repair device into the equipment. The cycle time can be divided into the following four situations, which will be described in detail below:

Loading/unloading time - the time required to load the workpiece into the equipment and fix it on the fixture, as well as the time required to unload the finished rice; The load time depends on the size, weight, and complexity of the workpiece, as well as the type of fixture.

Rice milling time - the time required for the rice mill to perform all necessary milling on the workpiece during each operation. The rice milling time for any given operation is calculated by dividing the total length of rice milled by the milling speed (i.e. the speed of the rice mill relative to the workpiece).

Idle time - also known as non production time, is the time required for any task that occurs during the process cycle to not require engagement and therefore removal of materials. This time includes the approach and retraction of the dao tool from the workpiece, the movement of dao tools between features, adjusting machine settings, and replacing dao tools.

Dao tool replacement time - the time required to replace a Dao tool beyond its service life and wear it out as a result. This time it is usually not executed in each loop, but only after reaching the tool's lifespan. When determining the cycle time, adjust the tool replacement time by multiplying it by the frequency of tool replacement to produce individual rice. Divide the tool replacement time by the tool lifespan.


Cycle stages of equipment rice milling process
Previous:Briefly introduce the working principle of the white rice grading screennext:Briefly introduce the working principle of the white rice grading screen

Contact Us

Shandong Jingliang Highway Machinery Co., Ltd.,

Contact:  Manager Fang

Mobile: 0086-13853793879(WeChat/Whatsapp)            

             Manager Zhang

Mobile: 0086-13863788361(WeChat/Whatsapp)

URL:www.ba-bao.cn

Chinese domain name:碾米機(jī).中國(guó)

E-mail:Fangmt2003@163.com    342756451@qq.com

Address: No. 2212 Jiuhuashan Road, Wenshang County Development Zone, Shandong Province


scan Enter the mobile station

scan
Enter the mobile station

Export business QR code

Export business
QR code

<p>Export business QR code

Export business
QR code

Shandong Jingliang Highway Machinery Co., Ltd.,         Record number:魯ICP備16049530號(hào)-2Publicity Information